events in huntington beachnyc dot traffic standard drawings

nyc dot traffic standard drawingsstabbing in hanworth today

Concrete (CON) hold All permits issued to work on concrete portions of the roadway are automatically placed on hold until a HIQA inspector performs an inspection of the work site to establish existing conditions before work begins. SPEED REDUCERS ARE PROPOSED FOR THE ROADWAY OF YOR WORK AREA. DO NOT PLACE MATERIALS, TRAILERS, CRANES, CONTAINERS, OR EQUIPMENT IN FRONT OF DRIVEWAYS, BUS STOPS, WITHIN FIFTEEN FEET OF A FIRE HYDRANT, IN AUTHORIZED PARKING ZONES OR BLOCKING ACCESS TO DEP WATER TESTING BOXES. As of August 31, 2017, a new Holiday Embargo (HE) review process has replaced the previously used HE waiver request process used by NYCSTREETS. WORK 9 AM TO 7 PM EXCEPT SUNDAY. Only one Emergency Street Opening Permit Number is required for a specific work location. 55 Water Street, Concourse Level FULL TRAVEL LANE RESTORATION WOULD BE REQUIRED FOR 11' WIDTH OF TRAVEL LANE AND THE LENGTH OF THE WORK PLUS ANY LL14 CUTBACKS. 1400 Williamsbridge Road, 1st floor Failure to comply with an order issued by the Commissioner may result in criminal or civil penalties. All CGL insurance policies must contain the following cancellation clause: In the event of expiration or cancellation of any such policy, the company will give the Permit Office at least 30 days' written notice prior to such expiration or cancellation. 47-40 21st Street - 7th Floor USE OF NO STOPPING ZONES, NO STANDING ZONES AUTHORIZED PARKING, DIPLOMAT PARKING AND TAXI ZONES IS PROHIBITED. With over 185,000 corners, the Pedestrian Ramp Program is a robust program focused on installing and upgrading pedestrian ramps (curb ramps) throughout the five boroughs. Download about 619-011: Work Zone Traffic Control General Tables & Legend; General Information 619-012: Sign Table Keywords: Sign, Table. A SEPARATE 221 PERMIT IS NOT REQUIRED FOR CAPITAL/GOVT PROJECTS. A permit is required for new sidewalk installation, repairs, and replacements. Section 8: SIGNATURE OF LEGAL ENTITY OFFICER (THIS INDIVIDUALS NAME WILL APPEAR ON ALL DOT PERMITS). If applicable, a permit from the Landmarks Preservation Commission (LPC) for the placement of a canopy in ahistoric district or attached to a landmarked building. Fax: (718) 699-7491 Street excavations must be performed in accordance with Section 2-11 (e) of the Highway Rules. Applicants may provide complete copies of insurance policies instead of certificates of insurance. Following are the steps for permit application, review and issuance at the borough Permit Offices: There are borough permit offices in Brooklyn, the Bronx, Queens and Staten Island. Five types are relevant to the citys street lights: I, II, III, IV, and V. Standard Street Light: Standard pole (Octagonal) with LED Cobra Head luminaire. Any of these holds will prevent a permittee from applying for new permits: New York City Department of Finance (DOF or Finance) hold If a permittee has failed to pay previously issued summonses/Notices of Violation (NOVs) to the New York City Environmental Control Board (ECB), all future permit requests may be placed on hold until the fees associated with the outstanding summonses/NOVs are paid. (718) 391-1937 350 St. Marks Place, Main Floor Enter at least two names of corporate officers, director, managing agent, owners, partner, etc., with titles and telephone number. For further information, call (212) 839-9435. Some of the construction-related activities covered under this category include placement of materials, equipment and temporary structures on the street or sidewalk (e.g., building materials, cranes, boom trucks, a shanty or trailer, construction container, security structure, tool cart, or construction parking regulation signs) or movement of construction equipment across roadways and sidewalks. Appendix ACommon Permit Types and Documents Needed, Appendix DOther Agency and Utility Contact Information, DOB BUILDER'S PAVEMENT PLAN (BPP) AUTHORIZATION FORM, (Initial submission only) Bronx.Forestry@parks.nyc.gov THE EMBARGO INCLUDES BUILDING OPERATIONS. City Hall, 3rd Floor WITHIN THIS 15 FEET THE FIRST 8 FEET ADJACENT TO THE CURB IS FOR MATERIALS/EQUIPMENT, THE THE REMAINDER OF THIS 15 FEET IS FOR 5 FOOT CLEAR FOR PEDESTRIANS WITH BARRIERS NO IMPACT ON THE REMAINDER OF THE 47 FEET OF THE REAMINDER OF THE ROADWAY AT ANY TIME._ MEC-07-270. Learn about ParkNYC. (212) 839-9666 Staten Island, NY 10301 Permittees can use these maps to make informed decisions while planning new projects. The completed application, affidavit, a stamped self-addressed envelope and a certified check made payable to NYC DOT for the permit fee (currently $70.00 for up to 300 linear feet) must be mailed to: The applicant submits permit application, proof of insurance (originally supplied during the registration process) and supporting documentation for review as to accuracy and completeness. Staten Island, NY 10301 Additionally, in the middle of each fiscal year, the New York City Department of Design and Construction (DDC) convenes a meeting with other agencies and utilities to discuss city projects under its purview that are expected to begin construction during the next four years. Any emergency work on a street that involves opening a utility access cover to gain access to an underground facility on a critical street during restricted hours requires an EAN. AN EMBARGO WILL BE IN EFFECT FOR THIS WORK AREA FROM 7/28/14 THRU 8/16/14 ALL ROADWAY/SIDEWALK OPENINGS WHICH CANNOT BE COMPLETED INCLUDING BACKFILL AND RESTORATION PRIOR TO 7/28/14 SHOULD NOT BE STARTED. If the applicant makes any changes to these authorized representative(s), he or she must update the Permittee Registration Application. IF WORK IS WITHIN 100FT OF A BRIDGE STRUCTURE, YOU MUST SUBMIT A SCALED DRAWING SHOWING THE WORK AND EXACT LOCATION. In this case, upon request of the permittee, NYC DOT will provide an opportunity to object to the permit revocation within five days after the request is received by NYC DOT. NORMAL LL14 RESTORATION IS REQUIRED. THE SITE OF YOUR PROPOSED WORK MAY BE WITHIN 100FT OF A BRIDGE STRUCTURE. VMS BOARD MUST BE REMOVED UPON COMPLETION OF THE APPROVED CLOSURE. Once OCMC executive staff determines the final permit stipulations, the permit will be released. THIS STIP IS USED FOR WORK IN A TRAVEL LANE. TO FRI. A separate permit is required for each construction-related activity, except where otherwise provided in the Highway Rules or by permit stipulations. MUST BE AN UNRESTRICTED PARKING LANE. CONNECT WITH US. Section 2.3 Key Principles for Effective Notice and Coordination of Planned Street Work, Section 3.3 The Permit Application Process, Section 3.6 Emergency Work and Special Circumstances, http://www.nyc.gov/html/dot/downloads/pdf/insurancereq.pdf, Instructions for Permittee Registration Application, Application for Roadway/Sidewalk Permit(s), Appendix A, Common Permit Types and Documents Needed, Appendix D, Other Agency and Utility Contact Information, Application for Governmental Work Permit(s), Section 3.5 Other Provisions Pertaining to Permits, Application to Renew Governmental Permit(s), The permit application is available online, Chapter 4, Section 4.5 Street Construction Inspections and Enforcement, Request for Roadway/Sidewalk Permits during Embargo Periods form, Section 4.3 Street Restoration Requirements, Building Operations/Construction Activity Permits, Minimum Clearance Requirements For Transformer Vaults, Department of Design and Construction, Construction Director Borough Offices, Department of City Planning Borough Offices, Department of Parks and Recreation Borough Offices, Environmental Control Board Borough Offices, Chapter 2Advance Notice and Coordination of Planned Street Work, Instructions for Filing Plans and Guidelines for the Design of Sidewalks, Curbs, Roadways and Other Infrastructure Components, Street Arterial Maintenance (SAM) Release Form for Protected Streets, Application to Renew Governmental Work Permit(s), Application to Reissue Governmental Work Permit(s), Written Consent from Property Owner to install and maintain a canopy, Temporary Construction Signage Purchase Directions, Construction Project Information Signs (CPIS) Directions, Engineering Package for Vault Application, Section 3.4 Canopy Authorization and Permits, Weekly milling, resurfacing and concrete repair schedules, Insurance and Indemnification Requirements from Title 34, Rules of the City of New York, Critical Streets list in the Highway Rules, Section 2-07 (c) (5), Franchise, Concession or Revocable Consent, Application to Re-issue Government Permits, Additional information about historic districts, Construction Embargos at the Special Traffic Advisory link, Request for Roadway/Sidewalk Permits during Embargo Periods, Information regarding sidewalk violations, Pave Street-W/ Engineering & Inspection Fee, Place Equipment Other Than Crane Or Shovel, Franchise Installations (Overhead Structures), Electric power lines, cables, conduit and lighting cables, Gas, oil, steam, petroleum and gaseous materials, Communications, alarm, signal lines, cables and conduit, Reclaimed water, irrigation and slurry lines, REQUIRES DOB APPROVAL or REQUIRES DOT FRANCHISE, CONDUIT CONSTRUCTION (CABLE, TELECOMMUNICATION) AND FRANCHISE, REQUIRES DOT HIGHWAY INSPECTION QUALITY ASSURANCE (HIQA) APPROVAL, REQUIRES APPROVAL FROM DOT SIGNALS UNIT or, REQUIRES DOB APPROVAL (IF IN CONJUNCTION WITH A NEW BUILDING OR BUILDING ALTERATION), FRANCHISE INSTALLATION (OVERHEAD STRUCTURE), REQUIRES APPROVAL FROM DOT STREET LIGHTING UNIT, Franchises, Concessions and Consents - (212) 839-6550, MTA/NYCT - Bus Operations - (646) 252-5517 or (646) 252-5544, 18 inches (maximum 24 inches) from the grating edge perpendicular to curb, Division of Review & Construction Compliance - (718) 595-5223 or Plan Review Section - (718) 595-5191, * Maintain minimum Clear Path requirement (Below), General customer service - (800) ASK-USPS, 5 feet offset along the curb line (Not Permitted in front), Department of Consumer Affairs - 311 or (212) NEW-YORK outside the five boroughs, Con Ed, Verizon, National Grid, etc. Prior to submitting a Street Opening Permit application, the Protected Streets Listing should be consulted in order to determine if the proposed work location is in protected status. Send corrections and additions to the Standard Drawings team. CANNOT WORK WHEN GOWANUS EXPRESSWAY HAS MORE THAN 1 LANE CLOSED SOUTHBOUND. More specific information on each permit type, including application procedures and fee structures are described in greater detail in Section 3.3 The Permit Application Process of this chapter. - see, UTILITY COVER EMBARGO 0700-1000 1600-2000 WEEKDAYS, UTILITY COVER EMBARGO 0700-1000 1600-1900 WEEKDAYS, UTILITY COVER EMBARGO/HOLIDAY EMBARGO 0600-2400 WEEKDAYS/WEEKENDS. FOR DRILLING OPERATION MAY WORK 7AM-6PM MONDAY - FRIDAY IN CURB LANE AND PART OF SIDEWALK. Tel: (718) 699-4700, Staten Island New York, NY 10013 See Section 3.5.1 Holds for more information. FULL WIDTH OF SIDEWALK SHALL BE OPENED TO PEDESTRIANS WHEN SITE IS UNATTENDED EXCEPT FOR CONCRETE CURING WHEN THAT PORTION OF THE SIDEWALK MAY REMAIN CLOSED PROVIDED ALL OTHER STIPULATIONS ON THIS PERMIT ARE COMPLIED WITH. Tel: (212) 860-1845, Queens This requires a minimum distance on narrow sidewalks (10-12 feet Secondary Streets) of 5 ft., or a minimum distance on wide sidewalks (Larger than 12 feet Main Streets) of 8 ft. Standard Drawings are not currently available for download from the shaded states. Tel: 718-556-7240 SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. This category of permits applies to construction-related activities that take place within the street and are generally associated with construction work adjacent to the street. NO LANE CLOSURES PERMITTED TWO HOURS PRIOR TO BARCLAYS CENTER EVENTS THROUGH TWO HOURS AFTER THE EVENT HAS ENDED. Download a PDF of theGlossary and Appendicesfor offline access to the Resources section. The concrete base must be restored at the same grade as the existing base; at no time may it be brought up to the asphalt course unless authorized by NYC DOT. Most vault work also requires plan approval and a permit from DOB. THIS PERMIT BECOMES VOID WHEN THE BUILDING STRUCTURE FIRST FLOOR LEVEL IS COVERED BY A ROOF, SECOND FLOOR OR A SECOND FLOOR SLAB. VARIANCE GRANTED TO WORK DURING THE"HOLIDAY" EMBARGO-NOVEMBER TO JANUARY, AS STIPULATED BY THE OCMC OFFICE. These holds can only be released by OCMC executive staff. THE PERMITTEE MAY BE REQUIRED TO PAY STATION DEACTIVIATION AND/OR REMOVAL CHARGES. LIGHTS MUST BE INSTALLED PRIOR TO 11/16 AND REMOVED BETWEEN 01/02 AND 01/15. Canopy permits are generally taken out by building owners, business owners, and canopy installers. Information on the restoration requirements for sidewalk repairs can be found inChapter 4 Executing Work in the Street. Long Island City, NY 11101 16 Court Street, 16th floor New York City streets include a complex mix of assets such as electric, gas, telephone, cable, water, sewer and steam lines, requiring coordination among the different asset owners when street work is performed. To request release of the hold, the permittee must contact HIQAs central office or one of the borough offices to update the file. The form must be completed and faxed to EAU, which will confirm that the applicant's insurance is current. Street excavators, including utility companies and developers, can access New York City Department of Transportation (NYC DOT) data and attend NYC DOT coordination meetings to facilitate effective communication regarding planned street work. Canopy placement must be adequate for public safety and must be suitable to the circumstances of the proposed canopy location and not interfere with the public use of the sidewalk. Specific requirements for filling in abandoned vaults can be found in Section 2-13(o) of the Highway Rules. Further information on insurance and bonds is available in Chapter 3 Permits and Approvals and in Section 2-02(a) of the Highway Rules. PERMITTEE MAY ALSO OCCUPY ONE TRAVEL LANE ADJACENT TO EAST CURB LANE 830PM TO 4:30AM.NIGHTLY FROM 10/4 THROUGH 10/15. LANE MUST BE AN UNRESTRICTED PARKING LANE. See the most recent version of Drawing # H1029 of the NYC DOT. NYCStreets system will automatically block an applicant from submission if insurance is not current. Applicant Information (Corporation, LLC or LLP), 1C. Orders, given orally or in writing, may be issued by the Commissioner to cease and desist work or to perform remedial action. (212) 839-8980 MAINTAIN 2 LANES SOUTHBOUND AND 1 LANE NORTHBOUND FROM 7AM-9AM M-F. REQUEST TO DEP:LOCAL AND EMERGENCY TRAFFIC DURING WORKING HOURS DURING NON-WORKING HOURS ONE LANE OPENED TO TRAFFIC. Tel: (718) 815-8541 on hearing days ALL PERMITS MUST BE ON SITE. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN, ALL TEMPORARY TRAFFIC CONTROL DEVICES, INCLUDING BUT NOT LIMITED TO SIGNS, CHANNELIZING DEVICES, FENCING AND MARKINGS SHALL BE PROVIDED, INSTALLED, MAINTAINED AND REMOVED BY THE PERMITTEE IN ACCORDANCE WITH THE MOST RECENT VERSION OF PART 6 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS (MUTCD). Find community presentations. Permittees are responsible for maintaining the restoration for the duration of the "Guarantee Period" and must retain insurance for this purpose. WHEN APPLICABLE, NYCT OR PRIVATE BUS COMPANIES MUST ALSO BE NOTIFIED. For questions, Monday to Friday from 8:30 AM until 5:00 PM. The permittee may apply for a re-issuance online, or in-person by accessing either theApplication to Re-Issue Permitsor theApplication to Re-Issue Governmental Work Permit(s). A statement of the basic construction details including type, description and color of the canopy covering; type, diameter and gauge of all supporting members; description of the frame, wind bracing assembly and sidewalk and building fastenings; description of proposed lettering on the canopy covering including exact wording and dimensions thereof; three 5 inch by 7 inch photographs of the proposed site. DOT currently specifies 3000 Kelvin as the color temperature for all luminaires. If a private homeowner is applying for a Sidewalk Repair Permit, and will be making the repair by himself/herself, the homeowner may apply for a permit by mail. The maximum transverse slope permitted for vault covers, gratings and other sidewalk structures is 1" in 5'. To release a VLT hold, the Permit Offices Plan Examination Unit must be contacted. THIS WORK HAS PRIORITY OVER OTHER NON-EMERGENCY WORK ON STREET SEGMENT. Listed in the following paragraphs are some of the requirements for canopy authorizations and permits. THE ROADWAY AND/OR SIDEWALK SHALL BE REPLACED IN-KIND. MAY BE INTERMITTENTLY CLOSED TO THROUGH TRAFFIC WITH THE USE OF FLAGGERS WHILE PROVIDING LOCAL ACCESS AT ALL TIMES FOR A MAXIMUM OF 90 MINS. Interpreting Parking or Traffic Sign or Regulation Locate Parking Signs on Specific Streets Parking Sign Fact Sheet Parking in a School Zone Parking Rules School Bus Parking PERMITTEE MUST NOTIFY NYPD/TRAFFIC MANAGEMENT CENTER 48 HOURS PRIOR TO CHANGING ANY SIGNS/MARKINGS. FIXED SIGN MUST BE REMOVED UPON COMPLETION OF THE APPROVED CLOSURE. At crossings, the height of Accessible Pedestrian Signals must be reachable by a person using a mobility device, at a preferred height of 42 inches and a maximum height of 48 inches (see, Existing foundations at traffic signal locations in certain flood-vulnerable areas are being replaced with coastal storm foundations that incorporate a square concrete pedestal raising the electrical components above some flood depths. If the applicant plans to construct a new vault or enlarge an existing vault, PEU will refer the applicant to NYC DOT's Office of Franchises, Concessions and Revocable Consents for a vault license. (212) 839-2430 POST SIGNS MEETING NYCDOT SPECIFICATIONS FOR DIRECTING PEDESTRIANS TO OPPOSITE SIDEWALK. Third, following installation of the canopy, a final inspection by HIQA is required to confirm compliance with the applicant's submitted plans. IN AREAS WHERE A FENCE/BARRICADE USAGE IS PERMITTED THE FENCE/BARRICADE CANNOT OBSTRUCT, RESTRICT OR COMPROMISE THE SIGHT LINES OF PERDESTRIAN/VEHICULAR INTERFACE. CRBRES-RESTORE AS PER SKETCH #2 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. THIS STIP IS USED WHEN MORE THAN 50% OF THE INTERSECTION HAS BEEN EXCAVATED OR IF WORK CROSSES THE MIDDLE OF THE INTERSECTION. OCCUPY 12 FOOT WIDTH OF ROADWAY; FULL WIDTH OF ROADWAY RESTORED TO TRAFFIC WHEN SITE IS UNATTENDED. See, Utilize recycled content in paving materials. If work is planned through the HE period, the critical reasons for the work must be included in the Work Description field of the application. MAINTAIN 1 - 11 FOOT LANE FOR 2 WAY THRU TRAFFIC W/FLAGGERS AT EACH END OF WORK ZONE. Fax: (718) 965-7753 Bureau of Permit Management and Construction Control The following section provides information on some issues that may delay the issuance of a permit or that may lead to the revocation of a permit. To release an FCR hold, the applicant must demonstrate that either he or she has begun the CRIA process or that the CRIA statement is not required. CONTRACTOR/PERMITTEE IS REQUIRED TO POST AND MAINTAIN ADVISORY SIGNS A MINIMUM OF48 HRS PRIOR TO CHANGING EXISTING PARKING REGULATION SIGNS TO APPROVED TEMPORARY CONSTRUCTION PARKING REGULATION SIGNS. If the work is more than 100 feet away from the bridge structure, applicants must send a certification by e-mail stating so. The Street Design Manual is New York Citys comprehensive resource for street design standards, guidelines, and policies. The applicant submits a completed Canopy Authorization Application, which must include the following: Written approval from the owner of the property to which the canopy will be attached. A sidewalk is the portion of a street, intended for the use of pedestrians, between the roadway and adjacent property lines. Typically, a valid permit issued by the New York City Department of Buildings (DOB) is required prior to application for permits in this category.

Skyking Richard Russell, Lillington Nc Obituaries, Articles N

nyc dot traffic standard drawings

nyc dot traffic standard drawings

nyc dot traffic standard drawings

nyc dot traffic standard drawings